Project
BGV Revamping
Service
Civil Detail Design and Civil works on a Fast-Track Revamping basisLocation
ItalyShut-down period
10 calendar daysTechnological supplier
Danieli SpaFerretti Construction executed the detailed civil engineering design and civil works for the installation of two Fast Finishing Monoblock lines for wire rod production, as part of a Fast-Track Revamping project in Italy.
The intervention, carried out in collaboration with technology supplier Danieli Spa, was planned to be completed during a shutdown period of only 10 calendar days, requiring exceptional organizational capabilities and rigorous execution time management.
Timeline:
Operational shutdown: 10 calendar days
Project:
Fast Finishing Monoblock for Wire Rod Production | No. 2 lines