Project

Fume Treatment Plant Installation

  • Mechanical and piping installation
Service
Mechanical, Piping and Steel Structures Installation
Location
France
Year
August 2024 – June 2025

Ferretti Construction carried out the mechanical installation, steel structures assembly, and piping system installation for a new fume treatment plant at an industrial paper production site in France.
The project, developed in collaboration with a leading environmental technology provider, required careful execution planning and coordinated management of activities at height and within confined spaces.

Timeline:
Site presence: August 2024 – June 2025

This project demonstrates Ferretti Construction’s ability to operate in complex industrial environments, ensuring quality, safety, and precision throughout all phases of the installation.