Project

New Slitting Line Foundations

Service
Civil Detail Design and Civil Works
Location
Italy
Year
2024
Technological supplier
FIMI Group Spa

Ferretti Construction was responsible for the detailed design and execution of the civil works for the construction of new foundations for a slitting line at a production facility in Guastalla (RE), Italy.

The project required deep excavation down to -8,00 m, with a finished pit depth of -7,00 m, below the groundwater table located at -2,50 m. These conditions demanded high technical standards for water management and structural stability.

Construction period:
May – August 2024