Project

Roughing Mill Revamping

  • Fast-Track Revamping
Service
Civil Detail Design and Civil works on a fast-track revamping basis
Location
Hällefors, Sweden
Year
2023
Shut-down period
10 calendar days
Technological supplier
Pomini Long Rolling Mills Srl

Ferretti Construction managed the executive design and civil works for the roughing mill revamping at a production site in Hällefors, Sweden, within an accelerated timeline intervention.

The project, developed using the Fast-Track Revamping approach, involved the use of 35.000 kg of reinforcing steel and was completed during a shutdown period of only 10 days, requiring high operational efficiency and precise planning.

Timeline:
On-site presence: May – August 2023
Operational shutdown: 10 days

Gallery