Reference

Filter by country:

2012

ITALYFoundation of New Slitting Line 2 & Packing Line

2012

ITALYReconstruction of EAF Slag Yard Wall with Fast-Track revamping system

2012

ITALYFoundations for HBI conveyor

2012

ITALYFoundation works for Slitter and Packling line, conduits line and electrical building

2012

ITALYStructural check of building C2 (ConSteel) plinths

2012

ITALYFoundations for lime-coal silo EAF furnace

2012

ITALYEngineering, civil works and metallic carpentry installation for the New Annealing Line BA4&5

2012

ANGOLAEngineering and civil works for Steel Melt Shop, Rolling Mill, WTP and miscellaneous yard facilities

2012

ITALYRevamping of EAF furnace foundations for Air cooling plant

2012

MEXICOBasic and detail Engineering for a new wire rod mill

2011

ITALYFoundations works for the new 120 ton VOD Plant

2011

ITALYModifications of Proler foundations

2011

ITALYTank cooling towers VOD (Vacuum Oxygen Degassing)

2011

ITALYScrap area Modification of the foundations of Vezzani shear

2011

ITALYNew bar finishing line – TAU rolling mill – F-F1 area – rolls output and roller way

2011

ITALYVOD Plant – secondary grounding network

2011

ITALYESP Rolling mill – Down coiler area – Cutting for enlargement of hole slab

2011

ITALYWater Treatment Plant

2010

ITALYCivil works for noise protection barrier

2010

ITALYFoundation works for Galvanizing Line n3 of the new Cold Complex

2010

ITALYCivil Works Sand Filters for reverse Osmosis System

2010

ITALYCivil works for Soundproofing Wall

2010

ITALYConstruction of scrap storage tank

2010

ITALYStructural reinforcement of slag yard wall

2010

ITALYPaving Works between wagon ladle Rails LF3 LF4

2010

BULGARIACivil Works N5 Basements + N2 Hybrid Tower for Wind Turbines

2009

ITALYFoundation and accessory works for Water Plant Pits

2009

ITALYFoundation works for Galvanizing Line n2 (HDGL2) of the new Cold Complex

2009

ITALYCold Complex Continuous Pickling Line – building pliths D1-H1 CPL

2009

ITALYCold Complex Continuous Pickling Line – modification of foundation for Coil-Car CPL

2009

ITALYRevamping of Hot Reversing Mill

2009

ITALYFoundation works for the new 10.000 tons Forcing Press, manipulator, ESR Furnace and Utilities

2009

LIBYACivil Structural Ancillary Works For Cold Rolling Mill

2009

LIBYATs-17 procurement and construction of piperack for the interconnection of the new utilities in the steel melt shop

2009

LIBYAFoundation works for skids

2008

ITALYPartial Demolition and Plinth Structural Recovery, Axes 5-A2/5 – B1

2008

ITALYCivil works for Down Coiler

2008

ITALYFirst Water Rain tank: supply and installation of concrete covers

2008

ITALYEAF Ovens Scaffolding: Plinths and reinforcement structure

2008

ITALYCivil works for conduits and electrical wells, Steel Mill area

2008

ITALYEnlargement of tower plates

2008

ITALYHorizontal Ladle Reheating and EAF pulpits infillings

2008

ITALYWTP Cooling Tower Basin

2008

ITALYFoundation works for ferro-alloy plate SV plants

2008

ITALYTanks of cooling tower WTP

2008

ITALYFoundation works for 2 sand filters

2008

ITALYWTP – ESP Line – Rectangular Homogenization Tank

2008

ITALYWTP – ESP Line – Trapezoidal Homogenization Tank

2008

ITALYFumes Plant: New Quencher room

2008

ITALYQuenchin Power Area – concrete plate