Reference
Filter by country:
2008
ITALYPush Pull Pickling Line Plant: Electrical and Hydraulic cabin
2008
ITALYCivil works for Buildings C1-C2 Expansion
2008
ITALYPush Pull Pickling Line: Acid Pipeline Duct
2008
ITALYPaving works for Push Pull Pickling Line
2008
ITALYWTP Electrical Cabin, Conduits, Vessel
2008
ITALYESP Roll Shop Mill: Foundation of Grinding 1 & 2
2008
ITALYESP Roll Shop Mill: Foundation of Grinding 3 and 400 bar Room
2008
ITALYFlushing Channel from ESP Mill to new scrap yard
2008
ITALYSpecial foundation for ESP scrap tank
2008
ITALYSupporting Sheet Piles, Flushing Channel
2008
ITALYPickling plant – special works for the storage pit
2008
ITALYStorage pit – direct foundations plinth 29-28″
2008
ITALYExpansion of the Directional Offices Building
2008
ITALYFoundation works for Ingot mold workshop
2008
ITALYFoundation works for Cold Complex Continuous Pickling Line
2008
ITALYCCM3 building U-U’ – paving area for bloom storage
2008
ITALYFoundation works for New Continuous Casting Machine
2008
ITALYCivil works for the rehabilitation of industrial paving Slitter area 1&2
2008
ITALYWaterproofing of oil waste recovery tank
2008
ITALYModification of existing foundations Heurtey Furnace
2008
ITALYEngineering of modification of existing foundations Heurtey Furnace
2008
ITALYExecutive Design for electrical cabin TMT
2008
LIBYANew Oxygen Plant Catic 250 TPD
2008
LIBYA0.8 Mtpy Bar Rolling Mill
2008
LIBYARevamping Of Double Strand Wire Rod Mill
2008
ITALYWTP Plant: Sand Filters Slab Reinforcement
2008
LIBYAEngineering of Cold Reversible Rolling Mill MINO
2007
ITALYFoundation works for Ferro-alloy plant
2007
ITALYSV Silos Battery for New Ferro-Alloy Plant
2007
ITALYFoundation works for Sedimentation Basin
2007
ITALYCivil works for ESP plant continuous casting
2007
ITALYCivil works for Hydraulic piping
2007
ITALYFoundation works for ESP Rolling Mill
2007
ITALYNew wall for scrap yard
2007
ITALYFirst rain water tank and sewering reconstruction
2007
ITALYConsteel Plant, EAF Furnace, Ladle Cars and 2 LF 3-4 Plants
2007
ITALYFumes plant area – realization of 7 diaphragms in reinforced concrete
2007
ITALYCooling Towers Tank
2007
ITALYCCM3 Storage Area Expansion and 1st Pit Bloom Storage
2007
ITALYCCM3 Storage Area Expansion and 2nd Pit Bloom Storage
2007
ITALYCCM3 – gradient formation casting pit at level -8.400 and reinforcement of tower pillars at level +7.800
2007
ITALYWall construction
2007
ITALYU-U Buildings Expansion Sewerage Deviation 800
2007
ITALYExecutive desgin and Installation of Primary Earthing network at CCM3 Plant
2007
ITALYExpansion of Walking Beam Luna 120 T/H furnace
2007
ITALYRevamping of Bloom Finishing Mill
2007
ITALYRain Water Basin for CCM3
2007
ITALYCivil works for the fumes cleaning system 4
2007
ITALYCivil works for the extension of storage area of CCM3 – plancher jets
2007
ITALYCivil works for CCM3 – realization of floating floors