2012
ITALYFoundation of New Slitting Line 2 & Packing Line
2012
ITALYReconstruction of EAF Slag Yard Wall with Fast-Track revamping system
2012
ITALYFoundations for HBI conveyor
2012
ITALYFoundation works for Slitter and Packling line, conduits line and electrical building
2012
ITALYStructural check of building C2 (ConSteel) plinths
2012
ITALYFoundations for lime-coal silo EAF furnace
2012
ITALYEngineering, civil works and metallic carpentry installation for the New Annealing Line BA4&5
2012
ANGOLAEngineering and civil works for Steel Melt Shop, Rolling Mill, WTP and miscellaneous yard facilities
2012
ITALYRevamping of EAF furnace foundations for Air cooling plant
2012
MEXICOBasic and detail Engineering for a new wire rod mill
2011
ITALYFoundations works for the new 120 ton VOD Plant
2011
ITALYModifications of Proler foundations
2011
ITALYTank cooling towers VOD (Vacuum Oxygen Degassing)
2011
ITALYScrap area Modification of the foundations of Vezzani shear
2011
ITALYNew bar finishing line – TAU rolling mill – F-F1 area – rolls output and roller way
2011
ITALYVOD Plant – secondary grounding network
2011
ITALYESP Rolling mill – Down coiler area – Cutting for enlargement of hole slab
2011
ITALYWater Treatment Plant
2010
ITALYCivil works for noise protection barrier
2010
ITALYFoundation works for Galvanizing Line n3 of the new Cold Complex
2010
ITALYCivil Works Sand Filters for reverse Osmosis System
2010
ITALYCivil works for Soundproofing Wall
2010
ITALYConstruction of scrap storage tank
2010
ITALYStructural reinforcement of slag yard wall
2010
ITALYPaving Works between wagon ladle Rails LF3 LF4
2010
BULGARIACivil Works N5 Basements + N2 Hybrid Tower for Wind Turbines
2009
ITALYFoundation and accessory works for Water Plant Pits
2009
ITALYFoundation works for Galvanizing Line n2 (HDGL2) of the new Cold Complex
2009
ITALYCold Complex Continuous Pickling Line – building pliths D1-H1 CPL
2009
ITALYCold Complex Continuous Pickling Line – modification of foundation for Coil-Car CPL
2009
ITALYRevamping of Hot Reversing Mill
2009
ITALYFoundation works for the new 10.000 tons Forcing Press, manipulator, ESR Furnace and Utilities
2009
LIBYACivil Structural Ancillary Works For Cold Rolling Mill
2009
LIBYATs-17 procurement and construction of piperack for the interconnection of the new utilities in the steel melt shop
2009
LIBYAFoundation works for skids
2008
ITALYPartial Demolition and Plinth Structural Recovery, Axes 5-A2/5 – B1
2008
ITALYCivil works for Down Coiler
2008
ITALYFirst Water Rain tank: supply and installation of concrete covers
2008
ITALYEAF Ovens Scaffolding: Plinths and reinforcement structure
2008
ITALYCivil works for conduits and electrical wells, Steel Mill area
2008
ITALYEnlargement of tower plates
2008
ITALYHorizontal Ladle Reheating and EAF pulpits infillings
2008
ITALYWTP Cooling Tower Basin
2008
ITALYFoundation works for ferro-alloy plate SV plants
2008
ITALYTanks of cooling tower WTP
2008
ITALYFoundation works for 2 sand filters
2008
ITALYWTP – ESP Line – Rectangular Homogenization Tank
2008
ITALYWTP – ESP Line – Trapezoidal Homogenization Tank
2008
ITALYFumes Plant: New Quencher room
2008
ITALYQuenchin Power Area – concrete plate