Reference

Filtra per Paese:

2008

ITALYPush Pull Pickling Line Plant: Electrical and Hydraulic cabin

2008

ITALYCivil works for Buildings C1-C2 Expansion

2008

ITALYPush Pull Pickling Line: Acid Pipeline Duct

2008

ITALYPaving works for Push Pull Pickling Line

2008

ITALYWTP Electrical Cabin, Conduits, Vessel

2008

ITALYESP Roll Shop Mill: Foundation of Grinding 1 & 2

2008

ITALYESP Roll Shop Mill: Foundation of Grinding 3 and 400 bar Room

2008

ITALYFlushing Channel from ESP Mill to new scrap yard

2008

ITALYSpecial foundation for ESP scrap tank

2008

ITALYSupporting Sheet Piles, Flushing Channel

2008

ITALYPickling plant – special works for the storage pit

2008

ITALYStorage pit – direct foundations plinth 29-28″

2008

ITALYExpansion of the Directional Offices Building

2008

ITALYFoundation works for Ingot mold workshop

2008

ITALYFoundation works for Cold Complex Continuous Pickling Line

2008

ITALYCCM3 building U-U’ – paving area for bloom storage

2008

ITALYFoundation works for New Continuous Casting Machine

2008

ITALYCivil works for the rehabilitation of industrial paving Slitter area 1&2

2008

ITALYWaterproofing of oil waste recovery tank

2008

ITALYModification of existing foundations Heurtey Furnace

2008

ITALYEngineering of modification of existing foundations Heurtey Furnace

2008

ITALYExecutive Design for electrical cabin TMT

2008

LIBYANew Oxygen Plant Catic 250 TPD

2008

LIBYA0.8 Mtpy Bar Rolling Mill

2008

LIBYARevamping Of Double Strand Wire Rod Mill

2008

ITALYWTP Plant: Sand Filters Slab Reinforcement

2008

LIBYAEngineering of Cold Reversible Rolling Mill MINO

2007

ITALYFoundation works for Ferro-alloy plant

2007

ITALYSV Silos Battery for New Ferro-Alloy Plant

2007

ITALYFoundation works for Sedimentation Basin

2007

ITALYCivil works for ESP plant continuous casting

2007

ITALYCivil works for Hydraulic piping

2007

ITALYFoundation works for ESP Rolling Mill

2007

ITALYNew wall for scrap yard

2007

ITALYFirst rain water tank and sewering reconstruction

2007

ITALYConsteel Plant, EAF Furnace, Ladle Cars and 2 LF 3-4 Plants

2007

ITALYFumes plant area – realization of 7 diaphragms in reinforced concrete

2007

ITALYCooling Towers Tank

2007

ITALYCCM3 Storage Area Expansion and 1st Pit Bloom Storage

2007

ITALYCCM3 Storage Area Expansion and 2nd Pit Bloom Storage

2007

ITALYCCM3 – gradient formation casting pit at level -8.400 and reinforcement of tower pillars at level +7.800

2007

ITALYWall construction

2007

ITALYU-U Buildings Expansion Sewerage Deviation 800

2007

ITALYExecutive desgin and Installation of Primary Earthing network at CCM3 Plant

2007

ITALYExpansion of Walking Beam Luna 120 T/H furnace

2007

ITALYRevamping of Bloom Finishing Mill

2007

ITALYRain Water Basin for CCM3

2007

ITALYCivil works for the fumes cleaning system 4

2007

ITALYCivil works for the extension of storage area of CCM3 – plancher jets

2007

ITALYCivil works for CCM3 – realization of floating floors